Back to the Tykon.io blog

Review Automation

The Customer Wasn't Home When You Finished: A Review-Gap Diagnostic for Electrical Contractors

Electrical work is invisible when it goes right, and the customer is usually gone by the time it's done. Five checks you can run on your last thirty jobs to find out why a shop with excellent work has a thin review record.

by Jerrod Anthraper

At 2:40 on a Wednesday, your tech torques the last lug on a 200-amp service upgrade, labels every breaker in handwriting you'd be proud to show an inspector, sweeps the garage floor, and texts the homeowner: all done, power's back, I locked the side door. The homeowner is at her desk across town. She gets home at six, flips a light, and everything works exactly like it did before — which is the entire point. That job will never produce a review.

The leak: your best work is the least visible

Around 92% of consumers read reviews before they buy. For electrical, that number does more work than it does in almost any other trade, because a homeowner has no way to evaluate what you did. They can't inspect a neutral bond. They can't tell a torqued lug from a finger-tight one. The review count is the only proxy they've got, so it carries the whole decision.

Now hold that against your own Google profile. Most electrical contractors running steady work have a rating in the high fours and a review count that looks like a company a quarter their size. The work is good. The record of the work is thin.

That's the leak. Not quality, not pricing — documentation of a reputation you have already earned and are not collecting on.

Why electrical specifically loses this one

Three things stack up, and they're structural rather than anybody's fault.

The first is that the relief happens without you there. Your customer's emotional peak was the moment they smelled something burning and you answered the phone. By the time you finish the work, the fear is already gone, and the finish is anticlimactic — which is the job done right.

The second is that the person present is often not the person who cares. Tenants let you in; landlords pay. Property managers schedule; owners never meet you. GCs hand you a punch list and a gate code. The person with the strong feeling about your work and the person on the invoice are frequently two different people, and nobody asks either one.

The third is timing. Electricians finish in attics, crawlspaces, and panels on exterior walls, often hours after the customer left for work. There is no natural handshake moment where an ask fits.

Compare that to a trade where the customer stands next to you at the end and looks at the result. A finished kitchen gets admired. A panel gets closed. The absence of a moment is the whole problem, and no amount of telling your crew to "remember to mention reviews" manufactures one.

Five checks you can run on your own jobs this week

Each of these is both a diagnostic and a fix. Run them against your last thirty completed jobs.

1. Count the jobs where nobody was home at completion

Pull your last thirty and mark each one: customer present at finish, or not. If more than a third came back "not present," you've found your single largest gap, and it isn't a motivation problem. It's a scheduling artifact.

The fix is to decouple the ask from the finish. A text sent the next morning — after they've lived with the work for one evening — reaches a person who is available and actually has an opinion.

2. Check who your reviews are about

Read your last twenty reviews and note what triggered each. If most of them describe an emergency — a dead panel, a sparking outlet, a same-day save — your review profile is being written entirely by your urgent work.

That skews what new customers think you do. A shop that reads as emergency-only gets fewer of the planned, scheduled, higher-margin jobs: service upgrades, EV chargers, remodel rough-ins. Start asking deliberately after the boring jobs, and the profile rebalances within a quarter.

There's a second-order effect worth naming. Emergency reviews get written under adrenaline, which makes them enthusiastic and vague. Reviews from planned work tend to mention specifics — the quote held, the crew showed up when they said, the labeling was clean. Those are the ones that win a bid against two competitors quoting the same scope.

3. Find out whether you're asking the payer or the person in the room

Sort your last thirty jobs into homeowner-occupied, tenant-occupied, and commercial or GC work. For the second and third groups, write down who actually got asked for a review, if anyone.

Most contractors discover they ask whoever signed, which for rental and commercial work is often the person with the least feeling about the outcome. Ask the tenant who got their power back and the property manager whose phone stopped ringing. They are different reviews and you can have both.

4. Time the gap between completion and the ask

For any job that did generate a review, find how many days passed between finishing and the customer posting. Then find the same gap for your average ask.

If you're asking a week or more out, you're asking after the memory has flattened. The window that works for electrical sits between the next morning and about seventy-two hours — long enough that they've used the work, short enough that they remember what it was like before.

There's a fast version of this check if your records are thin. Take your three most recent reviews and ask the tech who ran each job when he finished. You'll usually find they came from jobs where the customer was standing right there at completion, which tells you the same thing the full audit would.

5. Look at your dispatch board for the real reason

Here's the check that stings. Look at the four or five jobs where you know the customer was thrilled and no review exists. Then look at what your crew was doing the next morning.

They were on the next call. The ask doesn't fail because anyone forgot it mattered. It fails because the only people positioned to make it are the same people you need in a crawlspace at 7:15. Any fix that depends on a tech remembering at the end of a ten-hour day is not a fix.

What a rating change is actually worth

Moving from 3.5 to 4.5 stars can lift conversion by as much as 270%, and each additional star correlates with a 5-9% increase in revenue.

Even a single point of rating carries roughly a 12% conversion difference on its own. For a contractor quoting a $9,000 service upgrade, that isn't a marketing statistic — it's the difference between quoting six of those a month and quoting seven, on identical lead volume and identical ad spend.

The leverage here is unusual because you don't have to get better at anything. You already did the work. You're collecting the record of it.

Where this stops depending on your crew

The five checks above cost nothing but an hour with your job list. Running them permanently is the hard part, and check five explains why: the ask lives with the people who have the least room to make it.

That's the specific job James does. He watches for job completion in your system, waits for the next-morning window, sends the request to the right contact — the tenant, the homeowner, the property manager — and follows up once if there's no response. When a reply comes back unhappy, it routes to you instead of to a public review page.

For what that looks like at volume: AMG Transport Co., a Tykon client in transportation and logistics, went from five or six reviews a month to five or six a day. Different trade entirely, but the mechanism is identical — a consistent ask, sent at the right moment, to the right person, without anyone on the crew having to remember.

If you want a read on your own gap first, run check one on your last thirty jobs. The number that comes back usually tells you whether this is worth a conversation.